Industrial

A green metal box sitting on top of a black truck.

Optum Carlsbad Generator

Optum Generator Installation of new 600kW generator and (6) auto transfer switches. Project included construction of new generator enclosure, routing of conduit through warehouse, and upgrades to existing building electrical systems. All work was performed after hours to allow for uninterrupted operations of facility.

Optum Carlsbad Generator Read More »

A room with a door open and windows in the background.

Scott Commerce Center

Scott Commerce Center Design-build construction of (5) new offices, totaling 7,500 SF, and (5) full-height demising walls, within new 88,000 SF tilt-up industrial building in Menifee, CA. Provided 3d virtual and rendering services for owner’s marketing team. New office space included high-end restroom, breakroom, and office finishes, and access to grade level and dock doors

Scott Commerce Center Read More »